- UConn Health retained Zuvic Carr in February 2016 to provide consulting engineering design and construction phase services related to the evaluation and replacement of parking lots servicing the main building (~500 spaces).
- The initial task was to complete a geotechnical investigation to determine the composition of the pavement and design options for the reconstruction of each lot. Zuvic Carr also incorporated drainage and utility improvements.
- Part of this assignment was to schedule the construction of various parking lots to maximize the number of available parking spaces during construction, while maintaining smooth and safe traffic circulation.