Challenges
  • Southern Connecticut State University was looking to resurface their parking lots and install a new LED lighting system around the lot as part of the campus’ green initiative.
  • Zuvic Carr was selected to provide survey, geotechnical services, and site design services for the rehabilitation of Wintergreen Parking Lot (56,100 sf) and Parking Lot 5 (63,450 sf).
  • Pedestrian Access to buildings in the project area had to be maintained during all stages of construction.
Solutions
  • Assisted with bidding services and provided Construction Administration services that included: Attending field meetings • Consultation during construction • Evaluating contractor submittals • Responding to requests for information.
  • Design included: Full-depth reconstruction of the pavement • Demolition of concrete curbing and walks • Installation of granite curbing • Replacement of concrete walks, ramps, and storm drainage structures • Upgrading lighting to LED.
Highlights
  • Design and bid documents were prepared in just seven weeks, so construction could be completed during the summer months.